Standard: |
AISI, ASTM, BS, DIN, GB, JIS |
Keyword: |
Steel Structure Hangar |
Grade: |
Q235 Q355 |
Design Standard: |
GB, AS, ES, NSCP, or required |
Place of Origin: |
Jiangsu, China |
Certificate: |
BV ISO CE |
Brand Name: |
SAFS |
Surface treatment: |
Hot Dip Galvanised |
Model Number: |
AH-5 |
Roof Cover: |
Steel Panel / FRP Panel |
Type: |
Light |
Purlin: |
C.Z Shape Steel Channel |
Application: |
Structural Roofing |
Size: |
Client Requirements |
Tolerance: |
±5% |
Material: |
Q235B/Q355B,45#,40Cr |
Processing Service: |
Bending, Welding, Decoiling, Cutting, Punching, CUSTOMIZED |
Service: |
Excellent After-sales Service |
Supply Ability
Supply Ability: 2000 Metric Ton/Metric Tons per Month
Packaging & Delivery
Packaging Details:
balt ball and sleeves packing in wood carton;
Steel pipes packed by steel frame;
Or as required.
Port: QINGDAO LIANYUNGANG SHANGHAI
Picture Example:
Lead Time :
Quantity(Square Meters) |
1 – 1000 |
>1000 |
Est. Time(days) |
30 |
To be negotiated |
Product Paramenters
The hangar has a high fireproof performance to avoid fire. The mainframe of the hangar can adopt the space frame structure.
The installation is simple. We can provide technical support for installation.
As for the transportation of the steel components of the hangar, we adopt the overall packing and container transportation to avoid the damage of the steel members during the transportation process.
We have professional designers and engineers who can provide professional design proposals and suggestions for you free of charge according to your requirements. You can contact us at any time to tell us your requirements.
Product Name |
Manufacture Steel Structure Building Mobile Aircraft Hangar Roofing Construction Price |
Brand |
SAFS |
Size |
Customized according to customer requirements |
Steel Material |
Q235/Q235B/Q355/Q355B,45#,40Cr |
Design Standard |
GB,AS,ES,NSCP |
Certificates |
SGS, BV, ISO, CE, and customer-specified inspection agencies |
Warranty |
Main structure warranty for 50 years |
Shipping |
Shipped in 60-90days after the payment |
Installation |
Supervision installation |
Packaging Details |
Special package for spatial structure materials |